Table of contents
Quick summary
- A freight company profile site starts at IDR 3,000,000 per year, ready in 7 to 14 working days, up to 50 pages
- One page per origin and destination lane uses the SEO package from IDR 5,000,000 per year, up to 150 pages
- Branches and warehouses in many cities use the GEO package from IDR 8,000,000 per year, up to 500 pages
- Order, delivery note, proof of delivery, and billing modules cost IDR 5,000,000 each per year with the server, five bundled at IDR 20,000,000
- Hosting, SSL, server, a WhatsApp group, and unlimited revisions for a year are included. The domain is bought separately in your company name
Buyers type a lane, not a service
Freight enquiries rarely come from the owner of the cargo. The searcher is a buyer, an export import clerk, or a warehouse supervisor told to compare three vendors before an afternoon meeting. They type lanes and units of measure, never adjectives, and the prize is a monthly contract, not one shipment.
So a menu built from service types, road, sea, air, warehousing, nearly always loses. The winner is a lane page: origin and destination port, a transit estimate that counts waiting for a vessel, the cargo you refuse, and the unit behind the rate. An optimistic estimate returns as a complaint, so publishing 5 to 7 days beats publishing 3.
- Lane searches: freight Jakarta to Surabaya, cargo Jakarta to Papua, shipping rates to Kupang
- Fleet and unit searches: CDD truck hire, tronton, wingbox, price per kg, per cubic metre, per truck
- Commodity searches: heavy equipment, chemicals, frozen food, motorcycles, office relocation
Quote requests always arrive half finished
The daily problem in freight is not a shortage of leads, it is leads with no data in them. The message says how much to send goods to Medan, with no weight, no dimensions, no commodity. Sales asks five questions one at a time, and many buyers leave before the third.
A form built properly drags all of it out at once: origin and destination down to the district, actual weight, length by width by height, commodity, monthly volume, payment terms. A volumetric calculator explains why a 30 kilogram mattress is billed like 90, and the unit follows the mode: cubic metres by sea, truck class by road, from an engkel up to a tronton.
A tracking page replaces the phone that rings all day
One customer service number fields dozens of identical questions a day: where is my shipment. A useful result names real stages, not a row of green ticks: collected, in the origin warehouse, loaded to vessel or truck, arrived at destination, signed for. Each result needs its own link to paste to the customer.
Proof of delivery goes missing most often and costs the most when it does. A paper receipt sleeping in a truck cab delays invoicing by weeks, and a late invoice is a cash flow problem, not a filing one. A proof of delivery module has the driver photograph the signed sheet and attach it to that shipment number.
Your paperwork gets read before anyone invites you to tender
Factories and large distributors do not pick a carrier because a homepage promises speed and safety. Procurement wants proof your company can be an approved vendor: business registration, the transport or freight forwarding licence, tax registration, the deed of establishment, the cargo insurance limit, and a warehouse list with floor areas.
List fleet types with counts and payloads, not stock photos of someone else's trucks, then say which cities you staff yourself and which you cover through partners, because that gap shows on the first shipment anyway. A vendor registration form and a downloadable company profile PDF belong there too, since procurement must attach both in their own systems.
When a carrier needs app modules, and what is not worth paying for
A website stops being enough once the work moves inside: orders land, a manifest is built, delivery notes print, proof of delivery is collected, invoices go out, receivables get chased. That chain usually runs on spreadsheets and a WhatsApp group, which is where shipment numbers get swapped and invoices slip a month. Metanotech builds it as app modules at IDR 5,000,000 per module per year, server included.
The build order we use most starts with three modules: orders and quotes, delivery notes with proof of delivery, then invoicing, and those three plus the SEO website are what Paket Bisnis Berjalan covers at IDR 20,000,000 per year. Other features get sold to carriers and almost never get used.
- A live fleet GPS map on a public page, when a truck position is your customer's operational data
- Member accounts for retail senders when every customer you have is on a monthly contract
- A chatbot that guesses a rate your own sales team corrects two hours later
Metanotech packages by how many lanes and branches you publish
| Carrier situation | Package | From, per year | Capacity and timing |
|---|---|---|---|
| One flagship lane or a new warehouse | Landing Page | IDR 2,000,000 | One page, 3 to 5 working days |
| Profile, fleet, licences, twenty lanes | Company Profile Website | IDR 3,000,000 | Up to 50 pages, 7 to 14 working days |
| A page for every origin and destination pair | SEO Website | IDR 5,000,000 | Up to 150 lane pages |
| Branches and warehouses in many cities | GEO Website | IDR 8,000,000 | Up to 500 pages |
| Orders, delivery notes, proof of delivery, billing | App Modules | IDR 5,000,000 per module | Server included, five at IDR 20,000,000 |
Frequently asked questions
How much does logistics website development cost?
A company profile site for one freight company starts at IDR 3,000,000 per year with up to 50 pages, while a carrier wanting a page per lane takes the SEO package from IDR 5,000,000 per year, up to 150 pages. Hosting, SSL, the server, and unlimited revisions for a year are included, and the domain is bought separately.
How long does a logistics website take to build?
A freight company profile site takes 7 to 14 working days once the lane list, transit estimates, fleet data, and licence documents arrive. A single page for a new lane takes 3 to 5 working days. The usual delay is not design, it is transit estimates operations has not agreed on.
Can we change rates ourselves when the fuel surcharge rises?
Rate tables live as data in an admin panel, so your staff edit the price per kilogram, per cubic metre, or per truck class and the change is live at once. Fuel surcharges and peak season rates sit in separate fields, so the base price survives when an adjustment is pulled back.
Can a freight website show shipment tracking and proof of delivery?
A tracking page takes a waybill or delivery note number and shows the real stages through to signed receipt, with a link your team can paste to the customer. Signed document photos come from the driver's phone through a proof of delivery module at IDR 5,000,000 per year, server included.
Why does our freight company not appear when buyers search a specific lane?
The usual cause is a website with only road, sea, and air service pages and not one page naming a lane. Buyers type an origin city and a destination city, so the winning page is the one discussing that lane with its transit estimate and rate unit.
Does our logistics company need an app or just a website?
A website is still enough while everything after the quote fits one person and a few spreadsheets. Once dozens of delivery notes print daily and invoices run late because the signed paper never came back, that work belongs in app modules at IDR 5,000,000 per module per year. The common pairing is the SEO website plus three modules, Paket Bisnis Berjalan at IDR 20,000,000 per year.




